PPE2: 971 MW awarded to ground-mounted solar projects — Key takeaways

In September 2025, the support scheme for ground-mounted solar plants under the Multi-Annual Energy Programme (PPE, phase 2) enjoyed another success. In the 8th round of the ground-mounted tender, the French State awarded 971 MW across 165 projects.

The average winning price reached €79.48/MWh (i.e. €0.07948/kWh), a slight increase on the previous round. This new step shows that the ground-mounted solar segment remains dynamic in France — but also that project valuation is becoming more selective.

1. Key figures and market dynamics

  • Volume awarded : 971 MW for 165 projects — above this round's 925 MW target.
  • Smaller average project size : around 8.6 MWp in the previous round versus 5.9 MWp here, reflecting a growing shift towards smaller lots.
  • Average price : €79.48/MWh, stable or slightly up (+0.5%) on the previous round (€79.09/MWh).
  • Geographical breakdown : the regions with the largest awards include Centre-Val de Loire (≈ 209.2 MWp), Nouvelle-Aquitaine (≈ 179.2 MWp), Grand Est (≈ 138.8 MWp) and Bourgogne-Franche-Comté (≈ 135.1 MWp).
  • A more diverse set of winners : 68 developers won awards, 55 of them for less than 20 MW each. Lots are becoming increasingly fragmented.

2. Why these figures matter for solar players

Confirmation of an active market

Exceeding the target shows that the ground-mounted market remains attractive and able to absorb significant volumes despite a sometimes constrained environment. For developers and asset sellers, it is a sign that appetite for land, grid connections and mature projects remains strong.

But valuation is increasingly conditional

The relatively stable average price actually masks higher expectations. Smaller lots, fiercer competition and higher expected maturity mean that only well-structured projects will be valued at their fair level. A superficial file, uncertain grid connection or poorly secured land will quickly become a handicap.

3. For developers: how to prepare for this new landscape

  • Land : a well-chosen, secured site (lease, land use, compatibility), with environmental procedures well advanced.
  • Grid connection & network : a clear study of capacity, lead time and costs, and a grid integration strategy.
  • Timeline & execution : the round requires commissioning within a set deadline (here 30 months).
  • Industrial and financial set-up : a financing plan, insurance, guarantees and approved suppliers.
  • Strategic positioning : in a market where projects are smaller, competitive intelligence, cost anticipation and differentiation become key.

4. For asset sellers: a selective market = higher value for good assets

When it comes to selling a project or a permit, buyers look at far more than installed capacity alone. They favour:

  • technical and administrative maturity,
  • secured land and rights,
  • predictable grid connection,
  • the ability to meet the timeline,
  • the quality of the sale file (studies, risks, contracts, etc.).

In short: an "execution-ready" project will be more sought after, and therefore better valued. A project that is still immature will see its price negotiated down.

5. Our role at Almavision: turning requirements into a competitive advantage

We help our clients turn the market's rising expectations into a strategic advantage:

  • structuring a clear, complete file ready to be valued,
  • positioning the project to excel in tenders or transactions,
  • maximising the asset's value in a demanding market environment.

"Being ready" is no longer just a technical guarantee; it is a valuation criterion and a lever for differentiation.

Key takeaways

The award of 971 MW in the 8th round of the PPE2 tender confirms that the ground-mounted solar segment in France remains dynamic. But the message is clear: maturity, structuring and file quality are now essential to capture a project's full value. For developers and asset sellers alike, raw capacity is no longer enough; what counts is the robustness of the whole set-up.

Planning a sale, an acquisition or a valuation?

Let's talk: we will get back to you quickly.

Contact us →
Share:LinkedInEmail